This progect is wrapped up!
The living room FP in the main cabin was a challenge
Stone by stone it came together, some 100 pounds!
It took a week, but almost done
Sherri wanted a special design in the bedroom
The moon and sun centerpiece the bedroom FP
The fireplace is now a center point in the room. Click on the thumbnails above to see how it was built!
The project begins! Time to collect and break rock
I went for a mountain range theme
Solid granite from the creek
I see the light at the end of the tunnel!
800 pounds of morter and 1000 pounds of rock hand collected from our property. PROJECT DONE!
Damn I needed a shower! Felt like Fred Flintstone